Project Overview
Our team designed and constructed the facility to meet the end user’s specific requirements. This involved collaboration among various trade divisions and government departments to complete the project. Through this effort, Tether demonstrated the following skills:
- Design percentage review acceptance and execution
- Adherence to the facility and federal criteria regarding ADA compliance
- Supervise and manage sub-their groups
- Self-performance of project features
- Complete delivery of the newly constructed facility
Our team was tasked with supplying equipment, materials, and labor to design and construct a platform/elevator lift for NAVFAC Southeast.
Key features of the project:
- 100 % Design
- Demolish the Existing Structure
- Erecting the Superstructure
- Installing the Elevator Lift and Enclosure
- Painting and Roofing
- Electrical Systems
- Flatwork and asphalt paving
Throughout the project, we self-performed construction elements of demolition activities, site work, roofing, painting, and restoration.